HIL harness, docs, SDR PLL-wedge workaround; firmware flashed and in RX
This commit is contained in:
@@ -0,0 +1,18 @@
|
||||
# Standards Gaps — experimental shortcuts vs EN 13757 / OMS
|
||||
|
||||
This firmware is an RF feasibility experiment, NOT a standards-compliant
|
||||
repeater. Known deviations:
|
||||
|
||||
| # | Experimental behavior | Standard requirement |
|
||||
|---|---|---|
|
||||
| 1 | Repeats the raw telegram bit-exact, including hop-related fields | EN 13757-5 repeaters must manage the hop counter / C-field semantics so telegrams are not repeated endlessly |
|
||||
| 2 | Fixed development repeat delay 20-200 ms (default 50 ms) | OMS repeaters use randomized delays in the seconds range to avoid collisions |
|
||||
| 3 | Repeats every CRC-valid C1 telegram (optional dev whitelist) | Real repeaters filter by installation list |
|
||||
| 4 | No duty-cycle accounting | EU 868.95 MHz band has duty-cycle limits (1% for 868.7-869.2 sub-band per ERC 70-03); a production repeater must budget its TX time |
|
||||
| 5 | Duplicate suppression is a 2.5 s hash ring | Standard requires proper duplicate/loop protection semantics |
|
||||
| 6 | No AES, no decryption, payload treated as opaque | OMS security profiles apply to end devices; a transparent repeater may pass ciphertext, but production behavior needs review |
|
||||
| 7 | T1 telegrams are detected (shared 0x543D sync) but dropped | A combined C/T repeater would need 3-of-6 decode/encode |
|
||||
| 8 | Format B frames >128 bytes CRC-checked but rare path untested | -- |
|
||||
|
||||
None of these shortcuts may be carried into the production Solenos/Gebos
|
||||
gateway without explicit review.
|
||||
Reference in New Issue
Block a user