Timing Instrumentation

All values measured on the DUT with esp_timer_get_time() (monotonic microseconds), from captures/2026-09-01T10-34-24-hil (1200 s run, 72 repeats, 214 RX candidates, repeat delay set to 200 ms).

Measured

Quantity min median max n
RxDone -> reconstructed end of frame ("deaf tail") 9 360 us 12 240 us 17 120 us 214
TX airtime (SetTx to TxDone) 10 421 us 13 422 us 14 560 us 72
Programmed repeat delay (frame end -> TX start) 200 001 us 200 001 us 200 008 us 72
Repeated frame length (over-the-air bytes) 63 100 113 72

Independent confirmation from the SDR side (raw IQ, same run): observed burst duration differs from the computed airtime by 0.2-1.5 ms (median 1.2 ms), and firmware TX events align to observed RF within 0-3.1 ms (median 2.4 ms).

Derived

repeat delay accuracy      : +1 us to +8 us against a 200 ms setting
                             (jitter well under 10 us)
RX deaf time per repeat    : ~225.7 ms median
                             = 12.2 ms deaf tail
                             + 200.0 ms programmed delay
                             + 13.4 ms TX airtime

The programmed delay dominates by design; it exists to make SDR correlation possible during development.

The 12 ms deaf tail

The SX1262's GFSK packet engine cannot express Wireless M-Bus length semantics (format A carries per-block CRCs that the L-field excludes), so RX uses a fixed 255-byte capture and the firmware truncates in software using the L-field formulas. Consequences:

  • RxDone fires (255 - frame_bytes) * 80 us after the frame really ended; the firmware subtracts this to recover the true end-of-frame timestamp, which is what the repeat delay is measured from.
  • During that tail the receiver is not re-armed for sync search, costing 9.4-17.1 ms of receive availability per detected frame -- including for false syncs from the deliberately short 8-bit preamble detector.

Optimisation candidate (not implemented): poll GetRxBufferStatus after SyncWordValid, read the L-field as soon as it lands, then stop RX early once the computed frame length has been received. That would cut the tail to roughly the frame's own airtime and materially raise the duty cycle of a production repeater.

Relevance to the production gateway

  • A production repeater using randomized 5-25 s delays will have a very different deaf-time profile; the 200 ms figure here is a development artefact, not a design target (see docs/STANDARDS_GAPS.md).
  • The fixed-255 tail is an SX1262 packet-engine limitation, so it applies to any SX126x-based design. Budget for it, or implement early-stop RX.
  • Repeat-delay accuracy of a few microseconds shows the ESP32-S3 side has ample timing margin; timing precision will not be the constraint.

Airtime measurement vs true channel occupancy

tx_airtime_us and the duty-cycle ledger both use wall time from SetTx to the moment TxDone is observed. That interval includes SPI round-trips and up to ~1 ms of polling granularity, so it over-states true channel occupancy:

computed airtime, 102-byte payload : (102 * 80 us) + 640 us = 8.8 ms
measured SetTx -> TxDone observed  : 13.4 ms median

Consequences, both deliberate:

  • The reported duty cycle is conservative (over-counted by roughly 50 %), so the 0.1 % guard suppresses slightly earlier than strictly required. For a compliance guard, erring high is the safe direction.
  • Independent confirmation that the real occupancy matches the computed airtime comes from the SDR side, not the firmware: observed burst durations in raw IQ differ from the computed airtime by 0.2-1.5 ms (median 1.2 ms), i.e. the transmission itself is ~9-10 ms for a 100-byte frame as expected.

A production implementation should budget on computed airtime and use the measured value only for latency diagnostics.