2.8 KiB
Timing Instrumentation
All values measured on the DUT with esp_timer_get_time() (monotonic
microseconds), from captures/2026-09-01T10-34-24-hil (1200 s run, 72
repeats, 214 RX candidates, repeat delay set to 200 ms).
Measured
| Quantity | min | median | max | n |
|---|---|---|---|---|
| RxDone -> reconstructed end of frame ("deaf tail") | 9 360 us | 12 240 us | 17 120 us | 214 |
| TX airtime (SetTx to TxDone) | 10 421 us | 13 422 us | 14 560 us | 72 |
| Programmed repeat delay (frame end -> TX start) | 200 001 us | 200 001 us | 200 008 us | 72 |
| Repeated frame length (over-the-air bytes) | 63 | 100 | 113 | 72 |
Independent confirmation from the SDR side (raw IQ, same run): observed burst duration differs from the computed airtime by 0.2-1.5 ms (median 1.2 ms), and firmware TX events align to observed RF within 0-3.1 ms (median 2.4 ms).
Derived
repeat delay accuracy : +1 us to +8 us against a 200 ms setting
(jitter well under 10 us)
RX deaf time per repeat : ~225.7 ms median
= 12.2 ms deaf tail
+ 200.0 ms programmed delay
+ 13.4 ms TX airtime
The programmed delay dominates by design; it exists to make SDR correlation possible during development.
The 12 ms deaf tail
The SX1262's GFSK packet engine cannot express Wireless M-Bus length semantics (format A carries per-block CRCs that the L-field excludes), so RX uses a fixed 255-byte capture and the firmware truncates in software using the L-field formulas. Consequences:
- RxDone fires
(255 - frame_bytes) * 80 usafter the frame really ended; the firmware subtracts this to recover the true end-of-frame timestamp, which is what the repeat delay is measured from. - During that tail the receiver is not re-armed for sync search, costing 9.4-17.1 ms of receive availability per detected frame -- including for false syncs from the deliberately short 8-bit preamble detector.
Optimisation candidate (not implemented): poll GetRxBufferStatus after
SyncWordValid, read the L-field as soon as it lands, then stop RX early
once the computed frame length has been received. That would cut the tail
to roughly the frame's own airtime and materially raise the duty cycle of
a production repeater.
Relevance to the production gateway
- A production repeater using randomized 5-25 s delays will have a very different deaf-time profile; the 200 ms figure here is a development artefact, not a design target (see docs/STANDARDS_GAPS.md).
- The fixed-255 tail is an SX1262 packet-engine limitation, so it applies to any SX126x-based design. Budget for it, or implement early-stop RX.
- Repeat-delay accuracy of a few microseconds shows the ESP32-S3 side has ample timing margin; timing precision will not be the constraint.