Timing Instrumentation

All values measured on the DUT with esp_timer_get_time() (monotonic microseconds), from captures/2026-09-01T10-34-24-hil (1200 s run, 72 repeats, 214 RX candidates, repeat delay set to 200 ms).

Measured

Quantity min median max n
RxDone -> reconstructed end of frame ("deaf tail") 9 360 us 12 240 us 17 120 us 214
TX airtime (SetTx to TxDone) 10 421 us 13 422 us 14 560 us 72
Programmed repeat delay (frame end -> TX start) 200 001 us 200 001 us 200 008 us 72
Repeated frame length (over-the-air bytes) 63 100 113 72

Independent confirmation from the SDR side (raw IQ, same run): observed burst duration differs from the computed airtime by 0.2-1.5 ms (median 1.2 ms), and firmware TX events align to observed RF within 0-3.1 ms (median 2.4 ms).

Derived

repeat delay accuracy      : +1 us to +8 us against a 200 ms setting
                             (jitter well under 10 us)
RX deaf time per repeat    : ~225.7 ms median
                             = 12.2 ms deaf tail
                             + 200.0 ms programmed delay
                             + 13.4 ms TX airtime

The programmed delay dominates by design; it exists to make SDR correlation possible during development.

The 12 ms deaf tail

The SX1262's GFSK packet engine cannot express Wireless M-Bus length semantics (format A carries per-block CRCs that the L-field excludes), so RX uses a fixed 255-byte capture and the firmware truncates in software using the L-field formulas. Consequences:

  • RxDone fires (255 - frame_bytes) * 80 us after the frame really ended; the firmware subtracts this to recover the true end-of-frame timestamp, which is what the repeat delay is measured from.
  • During that tail the receiver is not re-armed for sync search, costing 9.4-17.1 ms of receive availability per detected frame -- including for false syncs from the deliberately short 8-bit preamble detector.

Optimisation candidate (not implemented): poll GetRxBufferStatus after SyncWordValid, read the L-field as soon as it lands, then stop RX early once the computed frame length has been received. That would cut the tail to roughly the frame's own airtime and materially raise the duty cycle of a production repeater.

Relevance to the production gateway

  • A production repeater using randomized 5-25 s delays will have a very different deaf-time profile; the 200 ms figure here is a development artefact, not a design target (see docs/STANDARDS_GAPS.md).
  • The fixed-255 tail is an SX1262 packet-engine limitation, so it applies to any SX126x-based design. Budget for it, or implement early-stop RX.